China's Photovoltaic Bracket Domestic Sales: Market Surge, Challenges, and Future Outlook

Why Is China's Photovoltaic Bracket Market Booming? [2025 Data Analysis]
China's photovoltaic bracket domestic sales reached ¥18.7 billion in Q1 2025 – a 23% year-on-year increase that's got everyone talking. But what's driving this solar mounting system frenzy, and can the momentum last? Let's break down the latest market data and industry shifts.
Current Market Landscape: Key 2025 Figures
Year | Domestic Sales (¥ billion) | YOY Growth |
---|---|---|
2022 | 42.1 | 18% |
2023 | 55.6 | 32% |
2024 | 72.9 | 31% |
2025* | 94.5 (projected) | 30% |
The Good, The Bad, and The Solar-Powered
Demand drivers:
- Rooftop solar mandates in 28 provinces
- New anti-corrosion standards (effective March 2025)
- Falling aluminum prices (-14% since 2024 peak)
But here's the catch: Lead times have stretched to 8-10 weeks for customized brackets. Suppliers are scrambling – just last month, Jiangsu-based SolarFrame delayed 12 projects due to raw material shortages.
Supply Chain Growing Pains: A Double-Edged Sword
While demand's through the roof, manufacturers face:
- Galvanized steel price volatility (¥5,200-¥6,700/ton in 2024)
- Labor costs up 18% in tier-1 production hubs
- Transportation bottlenecks at Shanghai/Ningbo ports
"We're seeing a classic capacity crunch," notes Dr. Wei Lin (Renewables Analyst, Shanghai Tech University). "The market needs 40% more production lines to meet Q3 forecasts."
Innovation Spotlight: Next-Gen Bracket Solutions
Top manufacturers are responding with:
- AI-driven design optimization (cuts material use by 15-20%)
- Modular systems for faster installation
- Hybrid aluminum-carbon fiber composites
Real-world case: Trina Solar's new "SnapMount" system reduced installation time by 40% in Shandong province pilot projects – a game-changer for utility-scale deployments.
What's Next for Buyers and Specifiers?
With the National Energy Administration's 2025-2030 plan dropping next month, industry watchers suggest:
- Diversify supplier bases beyond traditional hubs
- Lock in prices for Q4 deliveries now
- Consider pre-engineered systems over fully custom
As one Guangzhou-based EPC contractor put it: "The days of last-minute bracket orders are over. You need to plan solar mounting like you plan PV modules – 6 months ahead minimum."
Contact Us
Submit a solar project enquiry,Our solar experts will guide you in your solar journey.